Difference between revisions of "Villagebuild"
From BRC HOA
(Created page with "Arrival day will be splendid and challenging! We are all sure to arrive at different times and so we should most definitely have as solid a plan for the village build as possi...") |
Zac German (Talk | contribs) |
||
Line 6: | Line 6: | ||
*Bring a 100' rope marked in 5' increments (or if you're fancy, a 100' tape measure) | *Bring a 100' rope marked in 5' increments (or if you're fancy, a 100' tape measure) | ||
*Hydrate | *Hydrate | ||
+ | |||
+ | ==Who and What== | ||
+ | |||
+ | '''Bearwhalea''' | ||
+ | |||
+ | Zac | ||
+ | |||
+ | -arriving early-morning on Saturday (at least that's the plan) | ||
+ | |||
+ | -bringing the structure for Bearwhalea's public shade | ||
+ | |||
+ | -also bringing 165' tape measure |
Revision as of 20:29, 4 August 2014
Arrival day will be splendid and challenging! We are all sure to arrive at different times and so we should most definitely have as solid a plan for the village build as possible. This page should eventually form a solid, easy to follow plan but let's get all our thoughts out there.
- Measuring everything will be nearly impossible
- Measuring out and placing each camps largest structure (or the hardest thing to relocate) will be more workable
- Stay calm
- Bring a 100' rope marked in 5' increments (or if you're fancy, a 100' tape measure)
- Hydrate
Who and What
Bearwhalea
Zac
-arriving early-morning on Saturday (at least that's the plan)
-bringing the structure for Bearwhalea's public shade
-also bringing 165' tape measure