Difference between revisions of "Villagebuild"
Zac German (Talk | contribs) (→Who and What) |
(→Who and What) |
||
Line 23: | Line 23: | ||
*The rest of the campers arrive Saturday night | *The rest of the campers arrive Saturday night | ||
*I have purchased a 100' tape measure and now I feel inadequate | *I have purchased a 100' tape measure and now I feel inadequate | ||
+ | |||
+ | '''Rejuvenation''' | ||
+ | |||
+ | Damon | ||
+ | *Arriving Saturday night with big stuffs | ||
+ | *Using temporary sleep space arrival night, main setup Sunday | ||
+ | *We have a Bosch GML 40 Laser distance measure... | ||
'''Spank the Monkey''' | '''Spank the Monkey''' |
Revision as of 17:33, 11 February 2016
Arrival day will be splendid and challenging! We are all sure to arrive at different times and so we should most definitely have as solid a plan for the village build as possible. This page should eventually form a solid, easy to follow plan but let's get all our thoughts out there.
- Measuring everything will be nearly impossible
- Measuring out and placing each camps largest structure (or the hardest thing to relocate) will be more workable
- Stay calm
- Bring a 100' rope marked in 5' increments (or if you're fancy, a 100' tape measure)
- Hydrate
Who and What
Bearwhalea
Evan & Co
- arriving Friday
- bringing kitchen and sleep space, but not public shade
- public shade to arrive on Saturday morning
Dr. Carl's
Yeti
- Arriving Wednesday but not moving to Village space until Saturday
- The rest of the campers arrive Saturday night
- I have purchased a 100' tape measure and now I feel inadequate
Rejuvenation
Damon
- Arriving Saturday night with big stuffs
- Using temporary sleep space arrival night, main setup Sunday
- We have a Bosch GML 40 Laser distance measure...
Spank the Monkey
Nugget
-EA Crew arriving Saturday Afternoon
-Bringing everything darling including a 166' tape measure (take that Zac)
-1st night setup generally includes the 30' dome on the corner, the kitchen, and branching out from there.
Trashistan
-most Trashistanis will arrive between early Saturday morning and Saturday evening
building will involve:
-setting up a PVC pentadome, with a 15' center pole, and the "witches hat" fabric draped over and attached to surrounding structures and vehicles
-shower set up
-minimum build crew: Pippin, Alex, Deniz, Hero, Justin